Extensions in Beckenham
premium new build homes in South London
1 South Drive JElevate Your Living Space with high quality Loft Conversions in Croydon
Luxury New builds in South London and Croydon

New Builds

With a wealth of experience in new builds, we’ve successfully completed over 60 houses and flats in just three years.

Adapting to the latest regulations, we’ve seamlessly transitioned to constructing gas-free buildings.

Our plumbers, accredited by Mitsubishi, ensure top quality installations that meet the highest standards.

Explore the gallery below for examples of our work.

View some of our New Build Projects

12

Image 1 of 12

Elevate Your home Space with high quality new builds in Beckenham

Our expertise

New build construction stands as a cornerstone of the UK’s construction industry, and Excel Construction Ltd specialises in providing construction services tailored for various new build projects.

Whether it involves constructing a new house, developing multiple houses, undertaking a commercial venture, building an industrial unit, creating a community project, or establishing a sports complex, we have the expertise.

Engaging in new build construction offers you a fresh canvas to materialise your vision within the confines of your budget while considering the specific site constraints.

Especially in house building, Excel Construction Ltd  excels in offering the highest standard of ICW accreditation for your new home or residential development, providing peace of mind with its 10-year structural guarantee.

Client Testimonials

“Nothing short of exceptional. I would highly recommend Excel Construction UK to anyone seeking reliable and top-notch construction services. Their dedication to customer satisfaction and their craftsmanship truly sets them apart in the industry. Kudos to the entire team at Excel Construction UK for their outstanding work! ”
Carl van Heerden
“Excel construction are a conscientious, professional and highly skilled construction company. They build with meticulous detail and professionalism and I would not hesitate to recommend them for construction projects big or small..”
Martin McFadden
“We have worked with Excel construction for the first time on a projects in Fulham London fourteen years ago. Alex and his company was already then, very reliable, trustworthy , competent and hardworking. We can highly recommend Excel Construction not only for top quality of workmanship but also for excellent personal service and commitment to his customers..”
M Kitchens

FAQ

New Builds

The time it takes to build a new house can vary based on several factors, including the size of the home, the complexity of the design, site conditions, local regulations, weather, and the efficiency of the construction process. On average, constructing a new build home can take anywhere from 6 months to over a year. Here’s a breakdown of the typical timeline:
  1. Planning and Design Phase (1-3 months):
  • Obtaining necessary permits and approvals from local authorities might take a few weeks to a few months.
  • Architectural planning, designing the house, and finalizing the blueprints usually take several weeks to a few months.
  1. Site Preparation (2-4 weeks):
  • Clearing the land, grading, preparing the foundation, and establishing utility connections are part of this phase.
  1. Construction of Foundations (2-4 weeks):
  • Laying the foundation involves excavation, pouring concrete, and letting it cure properly before further construction.
  1. Building the Structure (3-6 months):
  • This stage involves erecting the frame, walls, roof, and installing windows and doors.
  • Interior and exterior work such as plumbing, electrical wiring, insulation, drywall, roofing, and siding is also done during this phase.
  1. Finishing and Interior Work (1-3 months):
  • Finishing touches including flooring, painting, cabinetry, countertops, fixtures, and fittings are added during this phase.
  • Exterior landscaping and final touches are completed.
  1. Inspections and Final Approvals (Variable):
  • Inspections by local authorities and obtaining final approvals might add a few weeks to the timeline.
  1. External Factors:
  • Weather conditions can impact the construction schedule, especially for exterior work.
  • Material deliveries, and unexpected issues can also influence the timeline.
The duration mentioned above is a general guideline and can vary significantly based on project-specific factors. Larger or more complex homes may take longer, while smaller or prefabricated houses might have shorter construction times. We will manage the construction efficiently to minimise delays.
We cover South London including: Richmond Upon Thames, Wandsworth, Kingston Upon Thames, Merton, Sutton, Lambeth, Southwark, Croydon, Southwark, Lewisham, Bromley and Bexley

Book your no obligation consultation